1. Staffing and professional qualifications:

TT

Category

Number

Experience

work (years)

I

University

22 people

 

first

Mechanical Engineer

ten

05-15

2

Bachelor of Economics

07

05-15

3

Electrical Engineer

05

02-10

II Colleges, Vocational

20 people

 

first

Colleges, intermediate mechanical

15

02-08

2

Colleges, intermediate economy

05

03

III Worker

86 people

01-20

  1. Infrastructure and machinery ( Yes profile picture attached )

      2.1 – Statistics of:

 

TT

Machine category

Number

SX water

01

Workshops 3 & 4 (6400 m 2 )

01

Vietnam

02

Plating factory

01

Vietnam

03

Mechanical workshop

01

Vietnam

04

6.5 m galvanized chain(Under construction furnace galvanized 12m)

01

Vietnam

05

HT automatic beam welding lines

01

China

06

CNC lines gouging

03

China, Taiwan

07

Girder crane systems, crane-          Gantry 20tan

–          Crane 10 ton

–          Iron Head 5 tons

–          Cranes, crane 3Mts sale

08

Vietnam

08

3-5 ton forklift

03

Vietnam

09

Forklift 2.5 tons

01

Vietnam

ten

Lathes Wasino

02

Best

11

Large milling machine

03

Best

twelfth

Shearing of 25 tons

02

Taiwan

13

The press (30; 40 tons)

03

Taiwan

14

05 functional shearing

01

Taiwan

15

Drilling machine (130; 800)

02

Best

16

IVT-100A plasma cutting machine

01

Italy

17

MIG 500 Welder

20

Vietnam

18

Submerged arc welding machine 650A

02

Vietnam

19

500A arc welding machine

06

Vietnam

20

2HP air compressor

02

Best

21

Wind machine cut stone turtles (CG-30)

01

Best

22

Hand grinder, cutter disc …

15

Vietnam

23

Drilling, drill

06

Vietnam

24

HM0810TA concrete Hammers

01

Vietnam

25

5-ton truck crane

01

Vietnam

26

Pickup cars

01

Ford VN

And a number of equipment, instruments and other mechanical … ..

2.2 – Infrastructure: The total area of the project: ~ 128,000 m 2

  • Phase 1 : 867 m 2 : Made of investment completed, including 04 main production factory block, office block factory, house to house protect- directions- An- stay home …
  • Stage 2 : 133 m 2 , is expected to invest in early 2016